| 1/22/09
The first
"beta" installation of a window replacing the door
on the 2nd bedroom. This meets all applicable fire codes and
offers natural light and a more pleasing look for the smallest
bedroom. It is part of the 2010/11 renovation plan.
Exterior
View:

The change
makes the hallway entrances look more traditional (stucco
work will be completed as we move along on the trial installation
in the second model room).
Interior
Views:

From the
small bedroom we finally get some natural light in the room
as well as a more standard look and feel vs a locked, blank
door.

We already
have window treatments (currently covering the door)that will
offer privacy when needed for the new windows as they are
installed.

This trial
install is in the second model unit. The plan is to utilize
the annual maintenance week in 2009 for 12 units at a time
to accomplish this unit upgrade. Other preliminary work planned
for the 2010/11 renovation may also be scheduled at the same
time. We need to be very aware of unit down time throughout
the process as occupancy is running at all time highs due
in large part to our very successful collection percentage.
This window
installation and the addition of the master bathroom doors
are basic design changes that will add to the value and looks
of every unit at Cypress Pointe Resort. As they can be accomplished
without other renovation work we are moving ahead with them
in 2009 and may add other improvements before the main renovation
kicks off. Watch here for more updates.
SOME ADDITIONAL
PROGRESS 1/24/09:

Interior
wall work gets done

You
can see outside the room and et some light if desired.

The
floor molding will be installed. The outside (stucco) work
is not completed yet.
See
previous Photos
|