| 6/6/11
- A few updated shots of the slow progress on the play area
and 2nd Floor Clubhouse windows.

Waiting for the installation of the new storm drainage system
to allow the finishing touches to the new play area.

The assembly of the equipment is basically complete.

Climbing dome.

Work on the new windows and doors continues on the Clubhouse.


The railings had to be removed for repair and realignment

6/14/2011
Update -

Thick,
weather proof padding, much like carpet padding, gets installed
around all of the play equipment.

All equipment
is placed to meet the latest clearance required for safety

The final
surface will be the artificial turf that will look good and
require minimal maintenance

The product
is installed much like a wall to wall carpet

The artificial
turf will hold up to kids play and allow for a more forgiving
surface than natural grass or other surfaces.

With
the turf installed we will be close to the end of the project
Update
6/16/11 - More "carpet" installation






This is
the pebble mixture that is swept into the "grass"
to keep it standing up

Spreading
the pebble mixture

First
look at the new pathway from the hot tub area to the new seating/play
area behind the pool house. Exsisting fence will be opened
up for access.
6/22/11
We're not done yet but it's edging ever so close

The
final landscaping work is underway near the new seating and
Dinosaur Play area. This is the new path from the hot tub
area. Also new kids swing in view.

The
new plants lined up ready for installation. The grass came
out looking really good!

Close
up of new landscaping that will tie in with existing by the
Pool House & Hot Tub. Section of white fence at top right
to be removed for opening.

A
look at one side of the relocated sand volleyball court. Note
all the new plants to separate the sand area from the pool
deck/walkways to the new Play area. Volcano can be seen in
upper left.

Opposite
side of relocated sand volleyball. Again all new plantings
between walkway & RALPH Building.

The new sitting area / pavers and extension toward sand volleyball
court. More new landscape plantings. Sprinkler system had
to be extended to service this area and the remainder of the
new play area.

Lower
right has new plantings installed - other plants await install.
This is the area nearest the white fence that borders Lake
St. An ornamental metal fence to match the existing pool fencing
is on order to be installed ASAP.
More
to come
See
previous Photos or Next
|