8/29/08
The week wraps up for the long Labor Day Weekend

The
paving work continues






At
the Cafe we have windows being installed






A
light and bright Cafe from the inside that will look out
to the Volcano pool

In
the lobby we have placed two sample boards with fabrics

and
furnishings to be in the 2010 model

The
final design is not ready yet but we want owners and guests
to have a taste for what's in store

A
VERY important part of the plan as originally outlined in
2004.

Owners
and guests will see the color / fabric / furnishing boards
near the stairway in the lobby.
We
hope everyone has a great Labor Day Holiday and we'll be
back with more updates next week.
See