| 11/8/08
The gazebo roof is 99% done


Like all
1 and 2 story roofs it is tile to maintain the original look
of the resort. Like the 3 story buildings the top roof is
metal.


And the
power is on at last - the new sidewalk lights early evening

Picnic
walkway lights (viewed through the Tennis mesh)


And the
gazebo (and all the courts) are lighted at night. Area will
close to guests at 11PM.

Expected
grand opening of the Recreation / Picnic should occur the
week of 11/10/08.
See
previous Photos
|