11/8/08 The gazebo roof is 99% done

Like all 1 and 2 story roofs it is tile to maintain the original look of the resort. Like the 3 story buildings the top roof is metal.

And the power is on at last - the new sidewalk lights early evening

Picnic walkway lights (viewed through the Tennis mesh)

And the gazebo (and all the courts) are lighted at night. Area will close to guests at 11PM.

Expected grand opening of the Recreation / Picnic should occur the week of 11/10/08.

See previous Photos