1/4/07
The lobby demolition is underway

The main
doors are closed

The old
tile is removed


For those
that remember this is where the fountain used to reside
next to Charlie and the staircase

The entrance
to the game room is blocked off along with the plants

The sales
area is also sealed off - note heavy dust on the old carpet.

The current
chandelier will be changed during the renovation

About
2/3 of the old tile is removed so far.

The lobby
is empty during the construction work.

Over
at Building 5 the tile is off on one side of the building


Only
buildings 6 & 7 are left to be stripped of tile once building
5 is done. 
The new water tight mebrane is installed immediately after
the tile is removed and the decking checked/replaced.
Much
more to come. Check back frequently.
See
1/3/07 Photos |