1/8/07 The lobby work continues.

Work is going on everyday to allow the lobby to reopen as soon as possible

Our designers check the progress

Most of the floor tile is removed (Front desk area)

Rear doors to pool

Entrance to game room

The floor is leveled and the lines set

The old window treatments come down (hallway to Gift Shop)

Serious demolition in the rest rooms as they are gutted to the walls

The need to improve the restrooms was the catalyst for this whole project

As often happens in remodeling some surprise gems are uncovered

The drop ceiling in the hallway covers a solid sheet rock underneath. That will be finished and used as the new ceiling.

The crown molding can also be saved and refinished

A major breakthrough at the RALPH building. Note meter in and the power is ON!

While the ceiling comes down in the Clubhouse it is being installed at the RALPH. This is the Maintenance area.

The laundry room

The break room nears completion

Much more to come. Check back frequently.

See 1/4/07 Photos