1/8/07
The lobby work continues.

 Work
is going on everyday to allow the lobby to reopen as soon
as possible

Our designers
check the progress

Most
of the floor tile is removed (Front desk area)

Rear
doors to pool 
Entrance
to game room 


The floor
is leveled and the lines set


The old
window treatments come down (hallway to Gift Shop)

Serious
demolition in the rest rooms as they are gutted to the
walls


The need
to improve the restrooms was the catalyst for this whole
project 
As often
happens in remodeling some surprise gems are uncovered

The drop
ceiling in the hallway covers a solid sheet rock underneath.
That will be finished and used as the new ceiling.

The crown
molding can also be saved and refinished

A major
breakthrough at the RALPH building. Note meter in and the
power is ON!

While
the ceiling comes down in the Clubhouse it is being installed
at the RALPH. This is the Maintenance area.

The laundry
room 


The break
room nears completion
Much
more to come. Check back frequently.