2/17/07 The wrap up of the weeks progress

Pouring the permanent pad for the A/C unit

Preparing stucco on Building 5

Preparing the pipe bollards to protect the building and equipment around the building

Setting the driveway curb forms

Curbing removed on the connection to Lake St

Pouring the concrete to set the bollards

The fountains on the Volcano have been altered to reduce the over spray, heat loss and improve the effect. The lighting has also been repaired

In the dark it looks almost real

Much more to come. Check back frequently.