3/13/07 The new driveway paving gets installed - UPDATES 3/14 & 3/15/07

Cleaning the area

Paving equipment arrives

Fencing is in place - new gates have not arrived

Sealer in place for finish coat

Pavement installed on the new cart path - resort side

Pavement near loading dock

Apron near Lake Street

Driveway meets the cart path - Lake Street side

Driveway entrance - East side of building toward pool

Location of the new driveway gate

Close up of cart path and sidewalk on resort side

The base for Charlies new home in the lobby

The new chandelier is being assembled for the lobby

UPDATE 3/14/07

The drainage system is installed behind building 7

Back at the new building the landscape work begins with new palm trees

New trees on the pool side

Pool side of the building

Trees by cart path and Building 5

Bushes on the back side/Lake Street

The access gates are installed and await the power operators

UPDATE 3/15/07

Bushes and mulch next to cart path

New landscape takes shape next to Building 5

Cart path by the RALPH Building

Fence line, building side on Lake St

Outside Building along new Access Drive.

3/17/07 And the final updates for this week:

The path to the pool by the resort (front) side of the RALPH Building

The pool side of the new sidewalk

New landscaping where the 1/2 basketball court used to be

So far the trees, shrubs and other plants along with the mulch are in place. Grass to be installed next week.

Small plants around the new transformer pad near sidewalk to building

Remember the exposed water main pipes? There still in there but much less visible now.

Completion of the perimeter fence relocation.

More bushes and trees near the sand volleyball and swing set area behind the pool

Low maintenance ground cover on the back side toward Lake Street.

Looking toward the delivery dock

The RALPH Building side of the cart path awaits the grass sod

The Building 5 side of the cart path also gets sod next week.

It is expected that the building, fencing and grounds will be totally complete by the Annual Meeting next weekend. The residential building exteriors will be painted next and the construction of the new recreation area in front of the Clubhouse is scheduled to begin in mid to late May.

Much more to come. Check back frequently.

See 3/3/07 Photos